Problem: When the landfill built its new trash cell hundreds of feet deep into the ground, they had to figure out how to keep rain water from filling up their newly dug pit.
Plan: Solves All Engineering evaluated the site’s needs for the pump’s flowrate, total lift, and operating conditions. Solves All Engineering provided a generator, plumbing, and robust pump spec’d for operating in extreme conditions (an active landfill full of trash debris)
Result: When it rains hard, the landfill knows they have the best equipment available moving water away from their business operations allowing them to keep running.